Studentarbete
Evenemanget har passerat

Mikael Bergelind & Lukas Thylin presenterar sitt examensarbete

Titel: Faster set-up for DES through integrated standardized template

Översikt

Evenemanget har passerat

Program: Mechanical engineering

Examinator: Mélanie Despeisse, IMS

Handledare: Qi Fang, Ninan Theradapuzha Mathew, Oliver Siipilehto Karlsson 

Opponenter: Jonathan Larsson; Mathias Börjesson & Filip Brattwall

When: June 14th 2023 at 15:00

Where: PPU Room 5012 Sunnanvinden

Abstract: 

Discrete Event Simulation is one way to analyze and optimize production facilities. The company Virtual Manufacturing AB partly carries out simulation projects for companies with production facilities. In these types of projects, the company talks to the client and analyzes what data that needs to be collected to correctly build the model in a digital environment. The task of collecting the right data and then use that data to manually build the layout of the facility in simulation programs like Siemens Plant Simulation or Visual Components, are a time-consuming part of these projects. This thesis work therefore strived to reduce the amount of time it takes to get from the time when a project is started until real value adding work in the form of improvements to the layout is done. The time that could be saved leavens potential for a larger environmental focus within the projects, or more time for the improving phase of the projects. By automating the build of the base model, the employee is relieved of the monotonous task of building the model manually. In this thesis work there has been an information retrieval phase where a questionnaire survey, informal communication with the employees and a research part has been carried out. The informal communication was carried out with employees that work with simulation projects in Siemens Plant Simulation and Visual Components. There was also a developing phase where the tasks of developing the template and the library files was done. An evaluating phase was also carried out where an experiment was done for Siemens Plant Simulation where the time difference of using the template for a real project was evaluated. The project resulted in a standardized Excel template for gathering the general information needed to build a base model of a production facility to be used in simulation and improvement projects. This Excel template was connected to the libraries that Virtual Manufacturing AB has within the programs Siemens Plant Simulation and Visual Components. These libraries were adapted to connect with the Excel template and use the information within. The file in Siemens Plant Simulation is more capable and can import the data from the template, build the base model and simulate the run of the facility with the correct properties. The file in Visual Components is only able to read the data from the template correctly, but only the test file not connected to the template is able to build the model. The experiment that was carried out in Siemens Plant Simulation showed that 14 hours and 15 minutes were saved by using the template and the library to automatically build the base model instead of building it manually.