SEASNAKE

The main goal of the SEASNAKE project is to provide a step change in the overall performance of a medium voltage cable system, while ensuring that they are highly reliable and lower the risks of ocean energy installations.

Project objectives:

• To increase the economic viability of OWC systems by reducing the Levelised Cost of Electricity (LCOE) at least 20%

• To proof that 95% availability can be achieved with an improved design for reliability, maintainability and survivability of all cable sub-systems, validated in a relevant environment, reaching TRL7

• De-risk and optimise the offshore operations

• Demonstration of dynamic cable solutions

• Minimise environmental impact

To understand challenges and to optimize components, more offshore tests and numerical modelling of loads are required. Through established methodologies, a later certification of solutions is prepared. A successful project strengthens the maritime cluster in Europe and create innovative solutions.

Partner organizations

  • Université Gustave Eiffel (Academic, France)
  • Waves4Power AB (Private, Sweden)
  • I-Tech AB (Private, Sweden)
  • Ocean Harvesting Technologies (Private, Sweden)
  • WaveVenture (Private, Ireland)
  • Corpower Ocean AB (Private, Sweden)
  • WavEC (Non Profit, Portugal)
  • RISE Research Institutes of Sweden (Research Institute, Sweden)
  • MWA Coatings (Private, Sweden)
  • NKT Cables AB (Private, Sweden)
Start date 10/12/2019
End date The project is closed: 31/10/2021

Page manager Published: Thu 03 Feb 2022.